Distribution & power transformers · Manufacturer since 2011

Distribution and power transformers, built to your project specification.

Oil-immersed and dry-type transformers from 30 kVA to 63 MVA, at 10 kV, 35 kV and 110 kV, plus compact substations, ring main units, LV switchgear and DC fast charging stations. Designed to IEC 60076, tested before shipment, and supplied from Hefei to 10 countries.

IEC 60076 · ISO 9001 · CE · 10 / 35 / 110 kV · up to 63 MVA · 20-day standard, 60-day HV lead time

2011

Established

28,000 m²

Production area

1,700

Units per year

10

Export countries

Products

Six product families, one engineering team

From 110 kV substation transformers down to 30 kVA distribution units. Every one built to the parameters in your enquiry — not pulled from a catalogue.

110 kV Power Transformers, 6.3 – 63 MVA

110 kV Power Transformers

Two- and three-winding oil-immersed power transformers for 110 kV substations, with on-load tap changing as standard, cooling to ONAN / ONAF / OFAF, and routine test records issued with every unit — third-party type testing arranged to your specification.

6.3 – 63 MVA110 kV

View specification →

Oil-Immersed Distribution Transformers, 30 – 3,150 kVA

Oil-Immersed Distribution Transformers

Sealed-tank and conservator units for distribution networks, industrial supply and renewable step-up. Copper or aluminium windings, step-lap CRGO cores, tanks finished for coastal and desert conditions.

30 – 3,150 kVA10 kV / 35 kV

View specification →

Dry-Type Transformers, 30 – 2,500 kVA

Dry-Type Transformers

No oil, no fire load, no bunding. Cast-resin units for indoor substations, high-rise buildings, metro systems and plants where an oil spill is not an option.

30 – 2,500 kVA10 kV

View specification →

Compact Substations, up to 2,500 kVA

Compact Substations

European and Chinese H-type (华式) prefabricated substations combining transformer, HV ring main unit and LV distribution in one weatherproof enclosure — assembled and routine-tested in our factory.

up to 2,500 kVA12 kV / 40.5 kV

View specification →

Ring Main Units & Switchgear, 12 kV / 40.5 kV

Ring Main Units & Switchgear

Ring main units, ring main boxes and low-voltage distribution assemblies built to match the transformer protection scheme you specify.

12 kV / 40.5 kV630 A busbar

View specification →

EV Charging Stations, 60 – 240 kW

EV Charging Stations

Floor-standing DC fast chargers for service areas, fleet depots and commercial car parks — 60 to 240 kW, GB/T or CCS2 connectors, supplied together with the compact substation and switchgear that feed them, from one factory.

60 – 240 kWGB/T / CCS2

View specification →

Non-standard configuration — traction, rectifier, furnace, earthing, or a voltage class not listed here? See how custom orders work →

Why buyers specify us

What separates a good bid from a cheap one

Distribution equipment is easy to quote and hard to get right. These are the six points our customers actually test us on.

Quotation in 24 hours

Send rated power, voltage ratio, cooling method and quantity. Our engineers respond within one working day with price, lead time and an outline drawing. Standard configurations up to 35 kV leave the works 20 days after drawing approval; 110 kV class units take around 60 days.

Built for 50 °C, dust and humidity

Insulation, cooling and surface finish are specified for Gulf and African site conditions, where a standard European design would be derated.

Tested, with the paperwork to prove it

Every unit is routine-tested in our own works before packing, and the records ship with the transformer. For 110 kV units a third-party type test at an accredited laboratory can be booked as part of the order.

Type test reports on request

Third-party type test documentation for standard designs, issued with the submittal package your consultant expects.

One protection chain

Transformer, ring main unit and LV panel designed together, so discrimination is verified rather than assumed on site.

Spares for the service life

Bushings, tap changers, gaskets and relays held for units already delivered, so a failure in year eight is not a rebuild.

Applications

Where our transformers are installed

Utilities, EPC contractors and industrial plants across the Middle East and Africa run our units in conditions that punish equipment designed for a European climate.

Utility Distribution Networks

Power and distribution transformers for 11 kV, 22 kV, 33 kV and 110 kV networks, built to the loss evaluation and protection requirements of utility t…

See scope →

Solar & Wind

Step-up transformers, pad-mounted units and skids for PV plants, wind farms and hybrid projects, specified for cyclic loading and high ambient tempera…

See scope →

Industry & Mining

Transformers and switchgear for cement, steel, chemical and mining loads, where downtime costs more than the equipment.

See scope →

Commercial & Infrastructure

Compact substations and dry-type transformers for buildings, airports, metro systems and public infrastructure projects.

See scope →

Oil & Gas

Distribution and auxiliary transformers for refineries, terminals and pipeline stations, finished for corrosive and hazardous-area environments.

See scope →

Water & Desalination

Transformers and assemblies for pumping stations, desalination plants and water treatment works, where continuous duty and corrosion resistance are th…

See scope →

How it works

From specification to shipment

Custom equipment fails on uncertainty, not on price. This is the exact sequence every order follows, and what you get at each stage.

Step 01

Send your parameters

Rated power, voltage ratio, cooling method, installation environment and required delivery date. A single-line diagram helps but is not required.

Step 02

Engineering review

We check feasibility, loss figures and compliance with your local grid code before any price is issued.

Step 03

Quotation and drawing

Price, lead time and an outline drawing for your approval — issued within one working day. Standard configurations up to 35 kV are scheduled at 20 days from drawing approval; 110 kV class units at around 60 days.

Step 04

Manufacturing

Core cutting, winding, oil processing, tank fabrication and assembly, all in our own works.

Step 05

Routine testing

Every unit is tested before packing. Customer or third-party witness testing can be arranged.

Step 06

Packing and shipment

Seaworthy packing, export documentation and logistics to your destination port.

Quality & compliance

Tested to the standard your project cites

Our quality management system is certified to ISO 9001. Every transformer is designed, manufactured and tested to IEC 60076, and CE marking documentation is available for the European market. Type test reports from independent laboratories are provided with the submittal package for standard designs.

IEC 60076 · IEC 62271 · IEC 61439 · ISO 9001 · CE

Transformer on the test trolley in the Changda routine test bay
Routine test bay — every unit is ratio, resistance, impedance, loss and dielectric tested before packing.

Next step

Send your specifications. Get an engineering answer in 24 hours.

Attach a datasheet or single-line diagram if you have one — it is not required. Our engineers will reply with a technical proposal, price and lead time.